Facilities Communications Series

Maintaining the Places Where our Packer Community Learns, Works, and Gathers

Just like your home, school buildings require ongoing maintenance to stay safe, functional and in good condition. From everyday needs like replacing light bulbs and purchasing cleaning supplies to larger projects like roof repairs and maintaining building systems, it takes continuous work and funding to keep buildings operating and prevent small issues from becoming bigger problems.

SSPPS currently maintains 768,397 square feet across six district buildings, plus Roosevelt Field. Caring for those facilities means maintaining what we have today while planning ahead for systems and infrastructure that will eventually need major repair or replacement.

Maintaining Our Schools Is Ongoing Work

School buildings require both routine maintenance and larger investments over time.
Every year, the district:

  • Performs preventive maintenance, inspections, and repairs
  • Services heating and ventilation equipment
  • Repairs roofs and plumbing
  • Maintains sidewalks, pavement, and parking lots
  • Protects and repairs high-use surfaces
  • Manages health and safety requirements, including indoor air quality, asbestos, and fire safety

This ongoing work helps extend the life of our buildings and systems and prevents smaller problems from becoming larger ones. But routine maintenance can only go so far.

When major systems such as roofs, heating and ventilation equipment, fire alarms or other infrastructure reach the end of their useful lives, the cost can exceed what is available through annual maintenance funding.

Think of it like a home: A household maintenance budget may cover regular upkeep, but it may not be enough to replace the roof, furnace, and electrical system at the same time.

hs building

SSP Secondary- Built in 1921
SSP High School and SSP Middle School

looking down a Lincoln Center hallway

Lincoln Center Elementary- Built in 1950
Originally built as a Middle School, but repurposed as an Elementary School in the 1970s.

Understanding the Size of the Need

The district’s most recent comprehensive facilities study, completed in 2022, identified approximately $150 million in deferred maintenance needs across SSPPS facilities.

That number did not develop all at once. It reflects years of maintaining aging buildings with limited annual facility funding.

SSPPS receives approximately $1 million annually from the state for facility maintenance. Each year, the district must prioritize those limited resources, addressing the most critical needs first, including:

  • Health and safety needs
  • Preventive and routine maintenance
  • Critical repairs
  • Failing or aging building systems
  • Projects necessary to protect and extend the life of district facilities

When available funding cannot cover all of the work needed in a given year, other projects must be postponed, or deferred, to a future year.

As those projects remain on the list, additional roofs, mechanical systems, pavement, plumbing, electrical systems, and other infrastructure continue to age and require repair or replacement. As a result, the deferred maintenance list continues to accumulate over time.

What does “deferred maintenance” mean?
It is not a list of work the district has chosen not to address. It is identified maintenance and infrastructure work that cannot all be completed within the funding available each year.

picture of an air handling unit at the secondary building

SSP Secondary Air Handling Unit
Building system upgrades like air handling units and electrical systems are one of the priorities identified in the 2022 comprehensive facilities review. 

Why Not Save Those Dollars for Larger Projects?

The district also cannot simply set aside its annual facility funding for several years to pay for larger projects. Those dollars are needed each year to maintain and preserve the buildings we have today.

Saving a significant portion of those limited resources would mean:

  • Completing fewer current repairs and maintenance projects
  • Deferring additional work to future years
  • Potentially allowing smaller problems to become larger/more costly
  • Adding more projects to the deferred maintenance list

While some facility funding can be carried forward for eligible future projects, the district must balance taking care of our buildings today with planning for larger needs that annual maintenance funding alone cannot address.

In the meantime, the district continues to maintain our buildings, address priority needs within available resources and explore the funding tools available to support larger facility needs.

The Bond Did Not Pass. The Needs Did Not Go Away.

In May, voters did not approve the district’s proposed $50 million bond request or renewal of the Capital Projects Levy. That decision determined that the proposed funding would not move forward. It did not, however, change the age or condition of our buildings or eliminate the maintenance and infrastructure needs identified across the district.

The district is now taking a fresh look at those needs. Rather than assuming the previous facilities plan remains the right path forward, SSPPS is:

  • Updating its facilities study
  • Reassessing current facility conditions and needs
  • Reviewing priorities
  • Considering available funding options
  • Preparing for future School Board discussion and community engagement

In the meantime, the district will continue maintaining our buildings and addressing priority needs within available resources.

What's Next for Facilities Planning?

calendar with September to January written on it

Update the
Facilities Study

September to January
Facility experts will take a fresh look at district buildings and infrastructure, updating information about building conditions, systems, anticipated needs, and priorities.

calendar picture with february to march written on it

Present the Updated Study to the School Board

February to March
The findings will be presented to the School Board, providing a current picture of facility conditions and needs and establishing a foundation for discussion of priorities and potential funding options.

calendar icon with february to may written on it

Community
Engagement

February to May
The district will share information, listen to staff, families, and community members, and better understand community priorities as options and next steps are considered

calendar icon with june written on it

Findings and Recommendations

June
Information from the updated study, School Board discussions and community engagement will be brought together to help inform recommendations for moving forward.

icon for facilities communication series

Still to Come with the Facilities Series

Throughout the year, we’ll continue to unpack the different pieces of the facilities picture at SSPPS, one topic at a time and answer some of the questions we’ve heard from our community and families.

  • How we will determine needs going forward
  • How you can be involved with the next facilities task force
  • How does the long-term maintenance funding compare to the cost of maintaining buildings
  • What happens if the critical needs cannot be addressed